google-site-verification=VS4k_L2RBVQ-dAN8PofS2E_C7WRulKEUKw2cwiE_8Lg
top of page

Prototype SMEC "Green Energy" device installed at Dalston in Cumbria

  • Writer: VerdErg
    VerdErg
  • Jul 31, 2013
  • 1 min read

Updated: Sep 10, 2018

Article in Tidelines issue 38 Spring/Summer 2013

Comentários


VerdErg Renewable Energy Limited
Registered in England & Wales No 6968542. 

Head Office: 6 Old London Road, Kingston upon Thames, KT2 6QF.

Registered Office: Sundial House, High Street, Horsell, Woking, Surrey GU21 4SU.

© 2022 VerdErg Renewable Energy Ltd

  • Black Twitter Icon
  • Black LinkedIn Icon
  • Black YouTube Icon
bottom of page